Erecting your Metal Building

Here are the general steps involved in erecting a metal building:

Step 1 – Site Preparation

The first step in erecting a metal building is to prepare the site where the building will be constructed. This includes clearing the land, grading the site, and making sure the site is level.

Step 2 – Foundation

Once the site is prepared, the foundation for the metal building must be constructed. This may involve pouring a concrete slab, installing a pier and caisson system.

Step 3 – Primary Framing

The next step is to erect the framing for the metal building. This involves assembling the steel beams and columns, and then securing them in place.

Step 4 – Secondary Framing

Once your beams are in place and secure, you’ll need to install the purlins on the roof and girts on the walls.

Step 5 – Walls

Once the framing is in place, the walls can be erected. This involves installing insulation, and then attaching the metal wall panels.

Step 6 – Roofing

After completing the walls, the roofing system can be installed. This is when you lay down insulation and then attach the metal roof panels.

Step 7 – Windows and Doors

Once the walls are complete, any necessary windows and doors can be installed.

Step 8 – Electrical and Plumbing

If needed, electrical and plumbing systems can be installed.

Step 9 – Interior Finishing

Finally, the finishing touches can be added to the metal building, such as interior finishes.

Conclusion

These are the general steps involved in erecting a metal building, but the specific process may vary depending on the size and design of the building, as well as the location and local building codes.